Budget Control

The highest level of control is at the system wide level, which is set on the Budget Control (BUDCON) configuration page. All constraints and guidelines in an application appear on this page as it is really a different view of the same data seen on the Budget Control Administration configuration page. Where the administration page is for defining a control, the Budget Control page is for turning on or off a control as well as setting what severities are allowed at other locations.

Only those fields not displayed on the Budget Control Administration control page are listed below.