Budget Level Control

The third place for control management is the Budget Level Control (BUDLCON) configuration page. This area of control settings will apply to all budget lines within a particular budget structure and budget level combination unless specified otherwise at a lower control level.

Budget lines without a displayed BFY value (structures 11 and 37 - 40 for example) will read the page with a BFY value of 9999. Those budget lines with a BFY value displayed, will read the page with that BFY whether it is a regular year or multi year (9999).

There is not a field listing as the fields other than Structure ID, Level ID, and BFY (which are self-explanatory) are listed in the Budget Control section.