Construction Allocation

The Construction Allocation (FACPA) reference page consists of two tabs of setup information to control the Program Asset Generation system process. The first defines the construction project as either a Program and all Phases or a Program with a subset of Phases. The second links the Program and Phases to a Fixed Asset Number and Component Number.

Field Information