Header

The Header tab on the Master Agreement Revision (MMR) transaction allows you to modify the general information associated with the entire procurement including the effective dates and dollar limits. You should only enter values in the fields in the column on the right if a change is needed to the existing value shown in the column on the left. For additional information, refer to the MA - Header topic.

The Header tab contains the following actions/links:

Page-Level Actions

Tab-Level actions/links